• Creator
    Topic
  • #10070
    peterepete
    Flatchatter

      I’m in a 4 block N.S.W Strata. Is it the case that if waterproofing treatment is required to a bathroom wall which is also a Common Property wall on the other side (in this case a hallway) and the bathroom is in it’s original constructed state, then it’s the O.C’s responsibility for the cost of repair ? And would that cost include removing tiles and bath, applying water-proofing and refitting tiles and bath – the entire job ?

    • You must be logged in to reply to this topic.